2014
?ód?, Poland

To serve the clients who visit Manufaktura commercial center in ?ód?, the investor decided to construct an additional 12,000?m2 large parking deck in the area. Special multi-level park decks were constructed between May and November 2014.?

Project Requirements

The main requirements of this project were high crack bridging ability even at low temperatures and a fast curing solution due to the unstable weather conditions in the area, especially for the top deck laying. Adequate waterproofing, and surface protecting features for a car park have been recognized as primary factors for the high viability of such a new-build project.

Sika Solutions

According to the above requirements, the specified system by Sika Poland for this project was the Sikafloor? pronto-RB58 system for the top deck 6,000 m2 and Sikafloor? MultidurES14 system for the intermediate floor 6,000 m2. ?

Products Used

Sikafloor?-11 Pronto
Sikafloor?-32 Pronto
Sikafloor?-18 Pronto
Sika?-Reemat Premium
Sikafloor?-161
Sikafloor?-264

Project Participants

Project Owner
Union Investment Real Estate AG

Architect
Sud Architekt Polska Sp. z o.o.

Engineer
Abatos Sp. z o.o.

Contractor
P.I.B Budecon S.A. – Flooring Sub-contractor Chembud Warsaw

Sika Organization
Sika Poland